Centraal Station (Rijndam): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
Line 14: | Line 14: | ||
| platforms= '''Metro:''' 3 island platforms<br>'''Tram:''' 1 island platform | | platforms= '''Metro:''' 3 island platforms<br>'''Tram:''' 1 island platform | ||
| tracks= '''Metro:''' 6<br>'''Tram:''' 2 | | tracks= '''Metro:''' 6<br>'''Tram:''' 2 | ||
| length= '''Metro:'''135m<br>'''Tram:''' | | length= '''Metro:'''135m<br>'''Tram:''' 55m | ||
| lines= M1, M2, M3, M4, T1 (street level) | | lines= M1, M2, M3, M4, T1 (street level) | ||
| code= '''C'''<br> '''G'''<br> '''I''' | | code= '''C'''<br> '''G'''<br> '''I''' |
Revision as of 10:04, 1 October 2017
Rijndam |
---|
Centraal Station
M1, M2, M3 Metro station M4 Metro station Tram stop |
|
---|---|
Opened | 2020 |
Type | Underground Metro station Tram Terminal |
Platforms | Metro: 3 island platforms Tram: 1 island platform |
Tracks | Metro: 6 Tram: 2 |
Length | Metro:135m Tram: 55m |
Lines | M1, M2, M3, M4, T1 (street level) |
Destination Code | C G I |
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks.
In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station.