Centraal Station (Rijndam)
| Rijndam |
|---|
| Opened | 2020 |
| Type | Underground Metro Interchange/Terminal Tram Terminal |
| Platforms | Metro: 3 island platforms Tram: 1 island platforms |
| Tracks | Metro: 6 Tram: 2 |
| Length | Metro:135m Tram: Unknown |
| Lines | M1, M2, M3, M4, (M5 Peak), T1 (street level) |
| Destination Code | C G |
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks.
In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station.