Centraal Station (Rijndam): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 15: | Line 15: | ||
| tracks= 4 | | tracks= 4 | ||
| length= 135m | | length= 135m | ||
| lines= M1, M2, M3, M4, (M5 Peak) | | lines= M1, M2, M3, M4, (M5 Peak), T1 (street level) | ||
| code= '''C''' (via [[Garenmarkt]])<br>'''G''' (via [[Nationale Opera]]) | | code= '''C''' (via [[Garenmarkt]])<br>'''G''' (via [[Nationale Opera]]) | ||
}} | }} | ||
| Line 34: | Line 34: | ||
{{Navigatie M4 2020}} | {{Navigatie M4 2020}} | ||
{{Navigatie_T1}} | |||
Revision as of 15:52, 30 September 2017
| Rijndam |
|---|
| Centraal Station |
|
|---|---|
| Opened | Unknown |
| Type | underground metro interchange/terminal |
| Platforms | 2 island platforms |
| Tracks | 4 |
| Length | 135m |
| Lines | M1, M2, M3, M4, (M5 Peak), T1 (street level) |
| Destination Code | C (via Garenmarkt) G (via Nationale Opera) |
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks.
In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station.