Centraal Station (Rijndam): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 21: | Line 21: | ||
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks. | The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks. | ||
In 2020, a new tunnel under the city centre | In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station. | ||
<br style="clear:both"/> | <br style="clear:both"/> |
Revision as of 10:57, 5 June 2017
Rijndam |
---|
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks.
In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station.