Centraal Station (Rijndam): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| Line 33: | Line 33: | ||
{{Navigatie M4}} | {{Navigatie M4}} | ||
Revision as of 16:18, 5 June 2017
| Rijndam |
|---|
The station originally began with two tracks and one island platform. Later, when the city centre loop was created, a second island platform was added with two more tracks.
In 2020, a new tunnel under the city centre opens, connecting to the line to Transferium Rijndijk (which opened in 2018). For this, a third island platform is created one level below (and beside) the existing metro station.