Stadionweg: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
<table style="width: 100%; border: 1px solid #6B6B6B; background: #eee; margin-top: 20px;"> | <table style="width: 100%; border: 1px solid #6B6B6B; background: #eee; margin-top: 20px;"> | ||
<tr> | <tr> | ||
<th colspan"1" style="background: #00418f; border: 0px solid #000000; text-align: left; color: #FFFFFF; font-size: 130%; padding: 0px;">[[File:Metro Simvliet.png|link=Simvliet| | <th colspan"1" style="background: #00418f; border: 0px solid #000000; text-align: left; color: #FFFFFF; font-size: 130%; padding: 0px;">[[File:Metro Simvliet.png|link=Simvliet|750px]]</th> | ||
</tr> | </tr> | ||
</table> | </table> | ||
Revision as of 21:22, 3 December 2014
Metro station Stadionweg is a big station which contains 5 tracks and 5 platforms. From this station, line A (towards Araplein) splits from the lines B and C (towards Tussenvelden). This station has one siding which continues towards Tussenvelden. The track between metro station Stadionweg and Araplein is electrified with overhead wire and is protected with a ZUB system. Only the RSG2, SG3 and RSG3 can drive on this track.
Metro station Stadionweg in 2020
Because of the timetable and traffic problems, there has been built a new drive-under which starts from track 1. The track between the metro station Stadionweg and Noordplein is no longer a single track. Its now possible to drive from track 5 towards metro station De Bergen, Simvliet Centrum and Simvliet Airport. Before the year 2020, line A stoped at track 2 and the lines B and C at track 1, that changed after the year 2020, because of the drive-under.