Simvliet Airport
Jump to navigation
Jump to search
Simvliet |
---|
Simvliet Airport | |
---|---|
Opened | 2020 |
Type | Metro station |
Platforms | 4 |
Tracks | 3 |
Length | 170 meters |
Lines | |
Destination Code | T |
Simvliet Airport is the western terminus of the Simvliet Metro located below the main terminal of the airport close the centre of Simvliet. The three tracks end with a buffer stop at the end of the platform. The middle track has a platform on both sides. In the tunnel before the station there are two sidings used to park trains between the morning and evening rush hour. The length of this station (170 meters) is for the coupling and uncoupling of the long trains SG3 and RSG3 from 3 to 2 and 2 to 3.