Noordplein: Difference between revisions
Clement lee (talk | contribs) |
Clement lee (talk | contribs) |
||
| Line 38: | Line 38: | ||
==== ''Platforms in 2020'' ==== | ==== ''Platforms in 2020'' ==== | ||
''Trains to Springstraat and Araplein'' | ''Platform 1: Trains to Springstraat and Araplein'' | ||
''Platform 2: Trains to Stadionweg, De Bergen, Simvliet Centrum and [[Simvliet Airport]]'' | ''Platform 2: Trains to Stadionweg, De Bergen, Simvliet Centrum and [[Simvliet Airport]]'' | ||
== New Features at Noordplein == | == New Features at Noordplein == | ||
Revision as of 09:46, 14 September 2014
Noordplein Station History
Noordplein Station is the First of the three Stations on the New Line Known as Line A (Simvliet) with a Passing Loop with two Platforms.
Noordplein is the First Station of the Fifth Section which opens in 2006.
The Line Runs from Stadionweg, via This Station and Varenweg before Springstraat.
The Station is Protected with ZUB Protection System with Signals.
There is a Double Track Line between this station and Stadionweg due to a Drive Under at Stadionweg for Line A to Araplein (Simvliet 2020)
in 2013, Line A was Extended over the main Line to Simvliet Centrum via De Bergen
This Station Has two Platforms
Platforms
Platforms in 2013
Platform 1: Trains to Springstraat
Platform 2: Trains to Stadionweg, De Bergen and Simvliet Centrum
Platforms in 2017
Platform 1: Trains to Springstraat and Araplein
Platform 2: Trains to Stadionweg, De Bergen and Simvliet Centrum
Platforms in 2020
Platform 1: Trains to Springstraat and Araplein
Platform 2: Trains to Stadionweg, De Bergen, Simvliet Centrum and Simvliet Airport
New Features at Noordplein
In Simvliet 2020 There is no single track, Instead there is a Double Track Line from Noordplein and Stadionweg due to a Drive under for Line A to Araplein.
Stadionweg < Previous station | Next station > Varenweg