Template:Rijndam 2022 1.4 Changes
Jump to navigation
Jump to search
- New
- Route from Rijndam Centraal to Zeeburg via Vierdijk
- Route from Zeeburg to Hondwijk aan Zee
- Rijndam-Simvliet Channel Tunnel between Hondwijk Tunnel Terminal and Essim Tunnel Terminal
- Changes
- New track layout at Rijndam Molenwijk
- Max ATB speed between Rijndam Zuid and Ypenburg raised to 130 km/h
- ETCS update on the HSL (and the Channel Tunnel) to level 2 (when closely following another train, you'll get the signalling update before passing the next blockmarker, so you don't have to slow down to a very low speed to pass the blockmarker)
- The sidings at Rijndam Centraal and Zeeburg have been defined as depots and can be used as such in activities