SG2/1
| Series | ||||||
5401-5418
| ||||||
| Protection | ||||||
ATB max. 80km/h
|
Along side with the MG2/1 the SG2/1 was the third type of passenger rolling stock on the metro system of Rotterdam. The SG2/1 is almost identical to the MG2/1 with only a few visual as well as technical differences. The trains were build between 2001 and 2002 to submit the SG2 stock on the East-west line which was extended at the time. The trains are equipped with pantographs for overhead wire as well as shoes for third rail. The fleet consists of 18 sets.
This train will be available in Beta 3.14.