RSG3
| Series | ||||||
5501-5522
| ||||||
| Protection | ||||||
The RSG3 rolling stock are the newest subway trains in Simvliet. The trains were built in 2008 and 2009 and were ordered to get in service on the extended A line. The older RSG2 trains ere suited to drive on line A between Stadionweg and Springstraat, but are not able to drive on the ATB protected parts of the route. The normal SG2 trains however, are not equipped to drive on the ZUB tracks between Stadionweg and Springstraat. In order to drive from Springstraat towards Simvliet Centrum in a straight way, new trains which can drive on both ATB and ZUB protection systems were needed. These trains are mostly used in service on the A line, but can be used in service as well on the B and C lines.