Template:Beta 3.13 Changes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
** A new bridge (made by [[User:Senjer|Senjer]]) replaces the old one, between [[Deallertweg]] and [[Rijndamsebaan]] tram stops | ** A new bridge (made by [[User:Senjer|Senjer]]) replaces the old one, between [[Deallertweg]] and [[Rijndamsebaan]] tram stops | ||
** Several bug fixes | ** Several bug fixes | ||
* [[Rijndam 2018]] | |||
** Bug fixes | |||
* [[Rijndam 2006]] | |||
** Bug fixes | |||
* [[Rijndam 1985]] | |||
** Bug fixes | |||
* Other changes | * Other changes | ||
** A new tram rolling stock: [[KTMCL|KTM Citylink]] | ** A new tram rolling stock: [[KTMCL|KTM Citylink]] | ||
* More features to be announced next week | * More features to be announced next week | ||
Revision as of 19:50, 4 February 2018
- Rijndam 2020
- The Metrovagonmash type 81-717/714 from the Moscow metro system is introduced to Lines M4 and M6
- Several new switches are added, for greater flexibility in case of service disruptions
- Line M4 converted to 3rd rail and ATB protection (instead of overhead wires & ZUB), for greater flexibility of non-ZUB and/or 3rd rail only rolling stock
- At 's Gravendijk, level crossings are replaced by an underpass for cars and bikes, as well as bridge for pedestrians to cross the tracks, due to the 3rd rail
- A new bridge (made by Senjer) replaces the old one, between Deallertweg and Rijndamsebaan tram stops
- Several bug fixes
- Rijndam 2018
- Bug fixes
- Rijndam 2006
- Bug fixes
- Rijndam 1985
- Bug fixes
- Other changes
- A new tram rolling stock: KTM Citylink
- More features to be announced next week