SG3
Jump to navigation
Jump to search
Series | ||||||
5601-5642
| ||||||
Protection | ||||||
The SG3 stock is the second batch of RSG3 in Simvliet. The trains were built between 2009 and 2012 and were ordered to submit the SG2 stock on the B and C lines. The trains are technical identical to the RSG3 stock. The color marks the only difference between the two series. These trains are mostly operational on the B and C lines, but can operate on the A-Line as well. The SG3 stock can run coupled with the RSG3 stock. The fleet consists of 42 sets.