SG2/1
| Series | ||||||
5401-5418
| ||||||
| Protection | ||||||
ATB max. 80km/h
|
Along side with the MG2/1 the SG2/1 was the third type of passenger rolling stock on the metro system of Rotterdam. The SG2/1 is almost identical to the MG2/1 with only a few visual as well as technical differences. The trains were build between 2001 and 2002 to submit the SG2 stock on the Calandlijn Later became Metrolijn A, B and C which was extended at the time. The trains are equipped with pantographs for overhead wire as well as shoes for third rail. And Also on the Eramuslijn later became Metrolijn D if necessary. The Trains are Also not Fitted with ZUB Systems which They Cannot Opreate on Metrolijn E between Rotterdam Centraal and Den Haag Centraal which is protected with ZUB. The fleet consists of 18 sets.
The MG2/1 and SG2/1 Sets are receiving the Midlife Revision which earlier was the Similar RET Livery on the SG3 Sets but These were Dropped for the new RET and R-NET Livery on 5401, 5412 and 5414.
SG2/1 Sets Remain is Service before Midlife Revision are on Sets 5402-5411, 5413, 5415-5418.