SG2/1
| SG2/1 | ||||||
|---|---|---|---|---|---|---|
| Series | ||||||
| 5401-5418 | ||||||
| Traction power supply | ||||||
| Third rail and Overhead wire | ||||||
| Protection | ||||||
| ATB max. 80km/h |
Along side with the MG2/1 the SG2/1 was the third type of passenger rolling stock on the metro system of Rotterdam. The SG2/1 is almost identical to the MG2/1 with only a few visual as well as technical differences. The trains were build between 2001 and 2002 to submit the SG2 stock on the East-west line which was extended at the time. The trains are equipped with pantographs for overhead wire as well as shoes for third rail. The fleet consists of 18 sets.