SG3: Difference between revisions

From MetroSim Wiki
Jump to navigation Jump to search
Samuel (talk | contribs)
Undo revision 2090 by Clement lee (talk)
No edit summary
 
(32 intermediate revisions by 10 users not shown)
Line 1: Line 1:
{{Rolling stock
{{Rolling stock
|naam = SG3
|name = SG3
|afbeelding =
|image = SG3 Screenshot.png
|beschrijving = <div style="text-align:center;"> [[File:SG3.png|275px]] <br/> <div style="text-align:center;"> [[File:HSG3-01.png|275px]] </div> </div>
|series = 5601-5642<br>5701-5722
|beschrijving2 =
|traction = Third rail and Overhead wire
|series =<div style="text-align:center;"> 5601-5642
|protection = [[ATB]] max. 80km/h<br>[[ZUB]] max. 100km/h
<br/> 5701-5716 </div>
|tractie = <div style="text-align:center;"> Third rail and Overhead wire </div>
|protection = <div style="text-align:center;">[[ATB]] max. 80km/h <br/> [[ZUB]] max. 100km/h </div>
|other =
}}
}}
Along side with the [[RSG3]] the '''SG3''' stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains (5600 Series) were built between 2009 and 2011 and are completely identical to the [[RSG3]] stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.  
Along side with the [[RSG3]] the '''SG3''' stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains (5600 Series) were built between 2009 and 2011 and are completely identical to the [[RSG3]] stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.  


Another 16 sets (5700 Series) were build between 2014 and 2016 for Metrolijn A and B but the livery was not Decided.
Another 22 sets (5700 Series) were build between 2015 and 2016 for Metrolijn A and B but the livery was not decided.
 
== In Simvliet ==
 
In Simvliet 2013, These trains (5600 Series) were used during Events and they can Coupled with the RSG3 Stock (5500 Series) due to having the Same Couplers Like those on [[MG2/1]] (5300 Series) and [[SG2/1]] (5400 Series) and They have Orange DMI rather than having the Blinds (MG2/1 5301-5342) and Green DMI (MG2/1 5343-5363 and SG2/1), but they have different Couplers due to the [[SG2]] (5200 Series) have two Electrical Connections and the Bombardier build Trains have a Single Electrical Connections and the SG2 have Blinds at both ends of the train and [[SG2]] have DC Traction motors whine the Bombardier trains have AC Traction Motors for faster Acceration and they can brake Quickly and Shorter than the [[SG2]].
 
In Simvliet 2017, these Trains (5600 Series) were Fully used on all Three Lines Throughout the Day plus New Extensions to Araplein in 2017 and Lelywaard in 2016 on Lines A and C. While the 5700 Series were used During events.


==== Operating Range ====
==In the Simulator==
Like the RSG3 and HSG3, these trains can be used on all electrified parts of the network. It includes:
* In [[Simvliet]]:
**The entire metro network
* In [[Rijndam]]:
**The entire metro network except the [[Line M7 (Rijndam)|M7]]


The SG3 can Operate on all Electrified Lines in Simvliet because they have [[ATB]] and [[ZUB]] which they can Swtich right before Arriving [[Stadionweg]] or Departing Stadionweg. Plus they have Third Rail Shoes and Overhead Pantograph for both Third Rail and Overhead Lines.
== Trivia ==
The name "SG3" is actually an acronym. The full name is "Sneltram Geleed 3-deilig," which in dutch stands for: "Light rail vehicle 3-segmented".


<gallery>
<gallery>
File:SG3Cabin.png|The SG3 Cabin
File:SG3Cabin.png|The SG3 Cabin
File:SG3Inside.png|The SG3 (5600 Series) Interior
File:SG3Inside.png|The SG3 (5600 Series) Interior
File:HSG3 Interior.png|The SG3 (5700 Series) Interior
File:SG3Real.jpg|Real version of the SG3
File:SG3Real.jpg|Real version of the SG3
</gallery>
</gallery>
<br style="clear:both"/>
{{Navigatie RollingStock}}

Latest revision as of 16:26, 4 October 2023

SG3
Series
5601-5642
5701-5722
Traction power supply
Third rail and Overhead wire
Protection
ATB max. 80km/h
ZUB max. 100km/h

Along side with the RSG3 the SG3 stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains (5600 Series) were built between 2009 and 2011 and are completely identical to the RSG3 stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.

Another 22 sets (5700 Series) were build between 2015 and 2016 for Metrolijn A and B but the livery was not decided.

In the Simulator

Like the RSG3 and HSG3, these trains can be used on all electrified parts of the network. It includes:

  • In Simvliet:
    • The entire metro network
  • In Rijndam:
    • The entire metro network except the M7

Trivia

The name "SG3" is actually an acronym. The full name is "Sneltram Geleed 3-deilig," which in dutch stands for: "Light rail vehicle 3-segmented".