SG3: Difference between revisions

From MetroSim Wiki
Jump to navigation Jump to search
Clement lee (talk | contribs)
No edit summary
No edit summary
 
(72 intermediate revisions by 10 users not shown)
Line 1: Line 1:
{{Rolling stock
{{Rolling stock
|naam = SG3
|name = SG3
|afbeelding =
|image = SG3 Screenshot.png
|beschrijving = <div style="text-align:center;"> [[File:SG3.png|275px]] </div>
|series = 5601-5642<br>5701-5722
|beschrijving2 =
|traction = Third rail and Overhead wire
|series =<div style="text-align:center;"> 5601-5642 </div>
|protection = [[ATB]] max. 80km/h<br>[[ZUB]] max. 100km/h
|tractie = <div style="text-align:center;"> Third rail and Overhead wire </div>
|protection = <div style="text-align:center;">[[ATB]] max. 80km/h <br/> [[ZUB]] max. 100km/h </div>
|other =
}}
}}
Along side with the [[RSG3]] the '''SG3''' stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains (5600 Series) were built between 2009 and 2011 and are completely identical to the [[RSG3]] stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.


Along side with the [[RSG3]] the '''SG3''' stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains were built between 2009 and 2011 and are completely identical to the [[RSG3]] stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.  
Another 22 sets (5700 Series) were build between 2015 and 2016 for Metrolijn A and B but the livery was not decided.


The SG3 Sets Enter Service in 2009 on the Rotterdam metro network to replace the older Duwag Sets ([[SG2]]).
==In the Simulator==
Like the RSG3 and HSG3, these trains can be used on all electrified parts of the network. It includes:
* In [[Simvliet]]:
**The entire metro network
* In [[Rijndam]]:
**The entire metro network except the [[Line M7 (Rijndam)|M7]]


The SG3 Sets is Indicial to the RSG3 Sets on Metrolijn E but Different Livery.
== Trivia ==
 
The name "SG3" is actually an acronym. The full name is "Sneltram Geleed 3-deilig," which in dutch stands for: "Light rail vehicle 3-segmented".
The RSG3 Sets are in RandstadRail White with Blue Roof Lines and Blue Doors with RET Logos place at the front ends and sides above the windows on the train, the SG3 Sets are in the RET grey with Red and Green Stripes with White RET logo on the Stripes.
 
They are Numbered as 5601-5642
 
Sets 5601-5611, 5616, 5619-5621, 5623-5629, 5631-5642 are operating on Metrolijn A, B, C and D and Sets 5612-5615,5617-5618, 5622 and 5630 are operated on All Metro Lines in Rotterdam Metro.
 
Set 5610 was involved in a Level Crossing Accident in Metrolijn A and B.
 
Sets 5601-5602 Enter Service on the Calandlijn which later became Metrolijn A, B and C in 2009.
 
Sets 5612-5613 Enter Service on Metrolijn E in 2010.
 
Sets 5614-5615 Enter Service on Metrolijn D in 2014.
 
Metrolijn A, B and C: 5601-5611, 5616, 5619-5621, 5623-5629, 5631-5636, 5638-5640
 
Metrolijn A, B, C, D and E: 5612-5615, 5617-5618, 5622, 5630, 5637, 5641-5642
 
 
== In Simvliet ==
 
In Simvliet 2013, These trains were used during Events and they can Coupled with the RSG3 Stock due to having the Came Couplers Like those on [[MG2/1]] and [[SG2/1]] and They have Orange DMI rather than having the Blinds (MG2/1 5301-5342) and Green DMI (MG2/1 5343-5363 and SG2/1), but they have different Couplers due to the SG2 have two Electrical Connections and the Bombardier build Trains have a Single Electrical Connections and the SG2 have Blinds at both ends of the train and SG2 have DC Traction motors whine the Bombardier trains have AC Traction Motors for faster Acceration and they can brake Quickly and Shorter than the SG2.
 
In Simvliet 2017, these Trains were Fully used on all Three Lines Throughout the Day plus New Extensions to Araplein in 2017 and Lelywaard in 2016 on Lines A and C.
 
==== Operating Range ====
 
The SG3 can Operate on all Electrified Lines in Simvliet because they have [[ATB]] and [[ZUB]] which they can Swtich right before Arriving Stadionweg or Departing Stadionweg. Plus they have Third Rail Shoes and Overhead Pantograph for both Third Rail and Overhead Lines.


<gallery>
<gallery>
File:SG3Cabin.png|The SG3 Cabin
File:SG3Cabin.png|The SG3 Cabin
File:SG3Inside.png|The SG3 Interior
File:SG3Inside.png|The SG3 (5600 Series) Interior
File:SG3Real.jpg|Real version of the SG3
File:SG3Real.jpg|Real version of the SG3
</gallery>
</gallery>
<br style="clear:both"/>
{{Navigatie RollingStock}}

Latest revision as of 16:26, 4 October 2023

SG3
Series
5601-5642
5701-5722
Traction power supply
Third rail and Overhead wire
Protection
ATB max. 80km/h
ZUB max. 100km/h

Along side with the RSG3 the SG3 stock was the fourth type of passenger rolling stock on the metro system of Rotterdam. The trains (5600 Series) were built between 2009 and 2011 and are completely identical to the RSG3 stock. The colour marks the only difference between the two series. The trains are mainly operational on Metrolijn A, B and C and elsewhere on the network if necessary. The fleet consists of 42 sets.

Another 22 sets (5700 Series) were build between 2015 and 2016 for Metrolijn A and B but the livery was not decided.

In the Simulator

Like the RSG3 and HSG3, these trains can be used on all electrified parts of the network. It includes:

  • In Simvliet:
    • The entire metro network
  • In Rijndam:
    • The entire metro network except the M7

Trivia

The name "SG3" is actually an acronym. The full name is "Sneltram Geleed 3-deilig," which in dutch stands for: "Light rail vehicle 3-segmented".