Beta 3.8

From MetroSim Wiki
Revision as of 14:01, 28 December 2014 by Tom (talk | contribs)
Jump to navigation Jump to search

Beta 3.8 is set in 2017 and contains some extentions. Line A has been extended to Araplein and Line C to Lelywaard. As a bonus, new trains of the SG3 series have been added with a different livery.


Version
BETA 3.8 · Version History