Second batch: MG2-II series 5051-5066, total 16 sets, years built: 1969-1970. | Second batch: MG2-II series 5051-5066, total 16 sets, years built: 1969-1970. | ||
Third batch : MG2-III series 5101-5126, total 26 sets, years built: 1973- | Third batch : MG2-III series 5101-5126, total 26 sets, years built: 1973-1974. | ||
Fourth batch: MG2-IV series 5151-5152, total 2 sets, years built: 1975 | Fourth batch: MG2-IV series 5151-5152, total 2 sets, years built: 1975 | ||
Revision as of 02:30, 31 July 2013
| Series | ||||||
5001 - 5027 and 5051 - 5066
5101 - 5126 and 5151 - 5152 | ||||||
| Protection | ||||||
ATB max. 80km/h
|
The MG2 stock was the first passenger rolling stock to enter service on the network. The trains were built in four batches between 1966 and 1975. There are a few visual as well as technical differences between the four batches.
First batch : MG2-I series 5001-5027, total 27 sets, years built: 1966-1967.
Second batch: MG2-II series 5051-5066, total 16 sets, years built: 1969-1970.
Third batch : MG2-III series 5101-5126, total 26 sets, years built: 1973-1974.
Fourth batch: MG2-IV series 5151-5152, total 2 sets, years built: 1975
The entire fleet got a technical overhaul between 1985 and 1989. These trains were always limited to the Simvliet Centrum - Oostpark section (currently line C), because they were never equipped with pantographs. Thus the trains cannot operate on the A nor the B-Line. The trains were never fitted with the ZUB protection system as well. The fleet consists of 71 sets.
-
Interior of MG2 trains
-
Differences between the batches