MG2: Difference between revisions
No edit summary |
No edit summary |
||
| Line 11: | Line 11: | ||
The '''MG2''' stock was the first passenger rolling stock to enter service on the network. The trains were built in four batches between 1966 and | The '''MG2''' stock was the first passenger rolling stock to enter service on the network. The trains were built in four batches between 1966 and 1974. There are a few visual as well as technical differences between the four batches. | ||
| Line 20: | Line 20: | ||
Third batch : 5101-5126, total 26 sets, years built: 1973-1974. | Third batch : 5101-5126, total 26 sets, years built: 1973-1974. | ||
Fourth batch: 5151-5152, total 2 sets, years built: | Fourth batch: 5151-5152, total 2 sets, years built: 1974 | ||
The entire fleet got a technical overhaul between 1985 and 1989. These trains were always limited to the C-Line because they are equipped to run with third rail power supply only. Thus the trains cannot operate on the B nor the A-Line. Also because they are not fitted with the ZUB protection system. The fleet consists of 71 sets. | The entire fleet got a technical overhaul between 1985 and 1989. These trains were always limited to the C-Line because they are equipped to run with third rail power supply only. Thus the trains cannot operate on the B nor the A-Line. Also because they are not fitted with the ZUB protection system. The fleet consists of 71 sets. | ||
Revision as of 20:58, 23 July 2013
| Series | ||||||
5001 - 5027 and 5051 - 5066
5101 - 5126 and 5151 - 5152 | ||||||
| Protection | ||||||
ATB max. 80km/h
|
The MG2 stock was the first passenger rolling stock to enter service on the network. The trains were built in four batches between 1966 and 1974. There are a few visual as well as technical differences between the four batches.
First batch : 5001-5027, total 27 sets, years built: 1966-1967.
Second batch: 5051-5066, total 16 sets, years built: 1969-1970.
Third batch : 5101-5126, total 26 sets, years built: 1973-1974.
Fourth batch: 5151-5152, total 2 sets, years built: 1974
The entire fleet got a technical overhaul between 1985 and 1989. These trains were always limited to the C-Line because they are equipped to run with third rail power supply only. Thus the trains cannot operate on the B nor the A-Line. Also because they are not fitted with the ZUB protection system. The fleet consists of 71 sets.