Remind me, what is the name of this route?
Epping-Ongar Railway
Moderator: senjer
- iamhankhamTS
- Posts: 282
- Joined: 12 Apr 2018, 23:13
- Location: East Sussex, United Kingdom
- Contact:
Re: Epping-Ongar Railway
Formerly iamhankhamTS but now Coastway Will on the internet - The forum just doesn't allow name changes
Re: Epping-Ongar Railway
Did you read the announcement?
-
- Posts: 346
- Joined: 01 Jan 2020, 21:48
Re: Epping-Ongar Railway
I was talking to iamhankhamTS
- iamhankhamTS
- Posts: 282
- Joined: 12 Apr 2018, 23:13
- Location: East Sussex, United Kingdom
- Contact:
Re: Epping-Ongar Railway
Formerly iamhankhamTS but now Coastway Will on the internet - The forum just doesn't allow name changes
Re: Epping-Ongar Railway
Then you should have read this part:
So yeah, part of the central line might be in the route, but how much is up to Sjoerd (and depending on the time available, it might be available straight away or as an update later). But keep in mind that the Central Line is a very long line with many kilometers of track, and recreating scenery based on a real route takes a lot of time, so don't expect too much here.
- iamhankhamTS
- Posts: 282
- Joined: 12 Apr 2018, 23:13
- Location: East Sussex, United Kingdom
- Contact:
Re: Epping-Ongar Railway
Aye! The whole Central line + Ongar would be more than 50 miles if you included the Hainault loop and both western branchesMichiel wrote: ↑01 May 2020, 10:32 Then you should have read this part:So yeah, part of the central line might be in the route, but how much is up to Sjoerd (and depending on the time available, it might be available straight away or as an update later). But keep in mind that the Central Line is a very long line with many kilometers of track, and recreating scenery based on a real route takes a lot of time, so don't expect too much here.
I wouldn't expect the entire line. That's sooooo much to do
Formerly iamhankhamTS but now Coastway Will on the internet - The forum just doesn't allow name changes
Re: Epping-Ongar Railway
Well, it depends on when 3.16 will be released. If 3.16 is far from being released, then Sjoerd would have way too much free time.iamhankhamTS wrote: ↑01 May 2020, 11:02 Aye! The whole Central line + Ongar would be more than 50 miles if you included the Hainault loop and both western branches
I wouldn't expect the entire line. That's sooooo much to do
Re: Epping-Ongar Railway
Well, you have see what time can do.... If you compare Rijndam 2022 v1.4 with..... Remember Rijndam 2016?
Or Toronto; I originally only intended to do line 509 "Harbourfront". But as the new release at the time took much longer then expected, I did line 510 "Spadina" too.
Or Toronto; I originally only intended to do line 509 "Harbourfront". But as the new release at the time took much longer then expected, I did line 510 "Spadina" too.
CEO of the Rijndam Electrical Transport company
-
- Posts: 587
- Joined: 16 Mar 2019, 17:47
- Location: Glasgow, Scotland
Re: Epping-Ongar Railway
Epping to Ongar Line was operated by 1962 Tube Stock, then from 1986 it was operated by 1960 Tube Stock until
it closed as LU service in 1994.
The 1962TS is similar to 1938TS except the front is different. Info here:
https://www.squarewheels.org.uk/rly/sto ... tubeStock/
The 1960TS was built by Cravens, only 12 motor cars were built. The trains originally worked with refurbished
Standard Stock trailers, but by 1983 they were replaced by refurbished 1938TS trailers. Info here:
https://www.squarewheels.org.uk/rly/sto ... tubeStock/
it closed as LU service in 1994.
The 1962TS is similar to 1938TS except the front is different. Info here:
https://www.squarewheels.org.uk/rly/sto ... tubeStock/
The 1960TS was built by Cravens, only 12 motor cars were built. The trains originally worked with refurbished
Standard Stock trailers, but by 1983 they were replaced by refurbished 1938TS trailers. Info here:
https://www.squarewheels.org.uk/rly/sto ... tubeStock/