Time for an official topic
As you might have guessed from the activity elsewhere in the forum, Beta 3.17 will focus on trams. Different from previous installments, these trams will be driven 'on sight' for most of the route. That means no overspeed protection and no signals, except for complex junctions. More on how this works later. Today the first testruns on Hageningen tram 13 were completed, here are a few screenshots to show the current work in progress:
TFS tram serving line 13 approaching tram stop 'Schapenmarkt'.
At Schapenmarkt, line 13 drives between Theater and Strandboulevard via Hageningen Centraal.
Approaching the junction at Hageningen Centraal, here signals control entry because of poor line of sight. We go straight.
Heading up the ramp to Hageningen Centraal upper level.
From here signals will be used again as we joint the lightrail.
Start of ZUB train protection.
Code received, speed limit 70km/u.
Driving past the beach.
Approaching Strandboulevard.
Getting ready for the return journey.
Approaching Hageningen Centraal again, inner platform, ZUB protection just switched itself off.
Down the ramp, signal clear to pass over the junction straight.
Points set to turn left towards the Church.
City centre, going straight here.
Theater, final stop, signal cleared to head into the reversing loop (platform 5).
At the reversing loop, ready to head back for another trip!
Beta 3.17
Moderator: senjer
-
- Posts: 234
- Joined: 05 Jun 2020, 15:07
Re: Beta 3.17
Looks great
route map pls
route map pls
My youtube channel containing several Metro sim videos https://www.youtube.com/channel/UCep1Mi ... sBZ9B0lwWA
-
- Posts: 205
- Joined: 28 Apr 2020, 18:05
- Location: Walthamstow ,England
Re: Beta 3.17
Will this beta also include the Essim to Simvliet and Hageningen Railway line.
Re: Beta 3.17
The tracks of the railway have been laid down and signals have been plaecd, but there are no buildings, no scenery, no overhead wires so don't expect the Essim railway to be completed anytime soon.
-
- Posts: 205
- Joined: 28 Apr 2020, 18:05
- Location: Walthamstow ,England
- Sgt_DeBones
- Posts: 655
- Joined: 05 Apr 2019, 15:23
- Location: Los Angeles, California
Re: Beta 3.17
Nice! Pin this topic, replacing 3.16.
Line 13 is a true light rail line. Rapid transit on one end, local tram on the other.
Line 13 is a true light rail line. Rapid transit on one end, local tram on the other.
Light Rail rapid transit (Tram-train) > Metro
Re: Beta 3.17
Personally I think line 12 will be the best lightrail example as it actually goes all the way to Zoutplas. Line 13 stays within the city boundaries of Hageningen and it does not have a direct route, in fact Theater and Strandboulevard are actually quire close together. It's a direct line only for convenience, but very few passengers will take it all the way around the city from end to end. Line 12 on the other hand will see passengers travel the full line from Hageningen Megamall to Zoutplas Molenpark.
- Leipzig_LP
- Posts: 365
- Joined: 03 Aug 2021, 16:42
- Location: Leipzig (Sachsen) Germany
- Contact:
Re: Beta 3.17
Very nice, especially the new tram tracks. I'm very excited for this map!
- Sgt_DeBones
- Posts: 655
- Joined: 05 Apr 2019, 15:23
- Location: Los Angeles, California