i tried 5 minutes on an activity, the trains were becoming delayed at eppingtrains 500 wrote: ↑24 Mar 2021, 17:38 why on the activites are the central line at 10 minute intervals in reality trains going to epping are very 6 -8 mins apart with a loughton or debedn train every 6-8 mins meaning a train north of buckhurst hill every 3-5 mins. i appreciate the debden/loughton terminators aint included in the game as theroute only goes as far as woodford
Epping-Ongar Railway
Moderator: senjer
- perfecttrains1000
- Posts: 496
- Joined: 30 Apr 2018, 17:50
Re: Epping-Ongar Railway
- Likes London Underground
- Somehow relates anything to trains
- Somehow relates anything to trains
-
- Posts: 234
- Joined: 05 Jun 2020, 15:07
Re: Epping-Ongar Railway
then just reduce the turn around time
My youtube channel containing several Metro sim videos https://www.youtube.com/channel/UCep1Mi ... sBZ9B0lwWA
- perfecttrains1000
- Posts: 496
- Joined: 30 Apr 2018, 17:50
Re: Epping-Ongar Railway
i'm sure they don't turn around 2 minutes after getting there, there's not enough time to change ends
- Likes London Underground
- Somehow relates anything to trains
- Somehow relates anything to trains
Re: Epping-Ongar Railway
HI,
Here are 2 files, which i have uploaded and will need to be placed in the "data\Central\activities" folder of Metro Simulator.
They will give you a 5 Min service between Woodford and Epping and a 10 Min service between Woodford and Roding Valley.
Enjoy.
Mike.
https://www.mediafire.com/file/dcu3j372 ... s.act/file
https://www.mediafire.com/file/m8xw4j2y ... 2.xml/file
Here are 2 files, which i have uploaded and will need to be placed in the "data\Central\activities" folder of Metro Simulator.
They will give you a 5 Min service between Woodford and Epping and a 10 Min service between Woodford and Roding Valley.
Enjoy.
Mike.
https://www.mediafire.com/file/dcu3j372 ... s.act/file
https://www.mediafire.com/file/m8xw4j2y ... 2.xml/file
-
- Posts: 106
- Joined: 15 Aug 2020, 14:17
Re: Epping-Ongar Railway
The points and signal doesnt change for the first service to roading valleymldaureol wrote: ↑24 Mar 2021, 20:03 HI,
Here are 2 files, which i have uploaded and will need to be placed in the "data\Central\activities" folder of Metro Simulator.
They will give you a 5 Min service between Woodford and Epping and a 10 Min service between Woodford and Roding Valley.
Enjoy.
Mike.
https://www.mediafire.com/file/dcu3j372 ... s.act/file
https://www.mediafire.com/file/m8xw4j2y ... 2.xml/file
Re: Epping-Ongar Railway
Hi,
The Train to Roding Valley should be Train 109 starting at Loughton at 0535.
It should then leave Woodford for Roding Valley at 0550 and then run a 10 Min service between Woodford and Roding Valley all day.
Mike.
The Train to Roding Valley should be Train 109 starting at Loughton at 0535.
It should then leave Woodford for Roding Valley at 0550 and then run a 10 Min service between Woodford and Roding Valley all day.
Mike.
-
- Posts: 106
- Joined: 15 Aug 2020, 14:17
Re: Epping-Ongar Railway
No the train leaves woodford sidings reverses in the reversing track into the northbound platform departs woodford but when it gets to the signal for the crossover into roding valley the points dont change and the signal remains red.
Re: Epping-Ongar Railway
You mean this bug (see below)? It was fixed....i play MSB all day wrote: ↑26 Mar 2021, 11:24 No the train leaves woodford sidings reverses in the reversing track into the northbound platform departs woodford but when it gets to the signal for the crossover into roding valley the points dont change and the signal remains red.
(There has also been a fix for missing signal aspects on the North Weald and Epping entry signals a litttle while later, so if you missed this fix, you missed the later one too.)
Sjoerd wrote: ↑14 Mar 2021, 11:14Both fixed, download link updated.perfecttrains1000 wrote: ↑14 Mar 2021, 10:42 Just found a bug with the ctd, for trains to roding valley, the block only starts being made when the train is in block 119 which is past the signal which as a result of the block not being made, is at danger, easy fix tho.
Edit: found another bug with signal LW35 which has its feather go the wrong way
https://sim.bemined.nl/wiki/EOR_%26_Central_Line
CEO of the Rijndam Electrical Transport company
- Alfacinha315
- Posts: 1032
- Joined: 16 Sep 2016, 14:20
Re: Epping-Ongar Railway
SPT (the company that runs Glasgow subway) offered to EOR one of the LU1973 cars which ran on the network.
Here are some screenshots of the today's test-runs, during a short stop at North Weald, direction Ongar.
Here are some screenshots of the today's test-runs, during a short stop at North Weald, direction Ongar.
- Attachments
-
- North Weald_1.jpg (162.47 KiB) Viewed 2893 times
-
- North Weald_2.jpg (236.44 KiB) Viewed 2893 times
Greetings from Lisbon, the capital city of Portugal.
-
- Posts: 106
- Joined: 15 Aug 2020, 14:17
Re: Epping-Ongar Railway
the train pulls into loughton platform 2 at 0536 then the path is created in the cvl for it to depart southbound but the train doesnt move