Release: MP89 / NS93 / Be 8/8 TL

General discussions

Moderator: senjer

Post Reply
PetttRocket
Posts: 346
Joined: 01 Jan 2020, 21:48

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by PetttRocket »

Sjoerd wrote: 09 Jun 2020, 20:32 Today I have added the vehicle numbers on the outside, and illuminated line diagrams and adds on the inside.
These banners should become repaintable.... ;)

How much designs are possible and where can the trains run?
Hi
User avatar
Sjoerd
Posts: 5677
Joined: 26 Dec 2014, 21:14
Location: Alphen aan den Rijn

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by Sjoerd »

Above the doors are the line diagrams. Above the windows in between the doors are the add banners, for which 3 repaintable textures are available. But as you can see on the screenshot; you can fit multiple adds on each add banner.

I plan to convert line M6 to the "Materiel Pneu" system for the next release.
Also, there is the Rijndam Airport Shuttleservice, for which I'll provide a shortened version of the train.

But if you really want to.... Technically you can run the train on all Rijndam & Simvliet 3rd rail lines too... it just wouldn't be very realistic to do so, as the normal train wheels in between the rubber tires are in reality only used for emergencies, guidence in switches, and workshop movements.
CEO of the Rijndam Electrical Transport company :D
PetttRocket
Posts: 346
Joined: 01 Jan 2020, 21:48

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by PetttRocket »

Sjoerd wrote: 09 Jun 2020, 20:55 Above the doors are the line diagrams. Above the windows in between the doors are the add banners, for which 3 repaintable textures are available. But as you can see on the screenshot; you can fit multiple adds on each add banner.

I plan to convert line M6 to the "Materiel Pneu" system for the next release.
Also, there is the Rijndam Airport Shuttleservice, for which I'll provide a shortened version of the train.

But if you really want to.... Technically you can run the train on all Rijndam & Simvliet 3rd rail lines too... it just wouldn't be very realistic to do so, as the normal train wheels in between the rubber tires are in reality only used for emergencies, guidence in switches, and workshop movements.

:(
Then is there only one full 3rd rail line. And so much trains without a pantograph.
Hi
User avatar
Sjoerd
Posts: 5677
Joined: 26 Dec 2014, 21:14
Location: Alphen aan den Rijn

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by Sjoerd »

3rd rail options:

Rijndam:
  • M1: Molenwijk - Noorderpoort
  • M2/'M3: Station Westplein - Centraal Station
  • M4: Entire line, Transferium Rijndijk - Rijndam Airport
  • M6: Entire line, Station Blaak - Tropicana
  • M7: 3rd+4th rail, but too narrow tunnels if you're not a London Underground tube-train. :D
  • Airport shuttle: Entire line, Terminal 4 - Parking P10.
Simvliet:
  • A: All, except for Stadionweg-Araplein section.
  • C: Simvliet Centraal Station - Airport - Centrum - Lelywaard - Delfsblaak
  • D: Hageningen, between Central Station and Strandboulevard
CEO of the Rijndam Electrical Transport company :D
User avatar
RotterdamMetroLover
Posts: 729
Joined: 23 Jan 2017, 15:21
Location: Somewhere in this blue world.

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by RotterdamMetroLover »

Sjoerd wrote: 10 Jun 2020, 10:12 3rd rail options:

Rijndam:
  • M1: Molenwijk - Noorderpoort
  • M2/'M3: Station Westplein - Centraal Station
  • M4: Entire line, Transferium Rijndijk - Rijndam Airport
  • M6: Entire line, Station Blaak - Tropicana
  • M7: 3rd+4th rail, but too narrow tunnels if you're not a London Underground tube-train. :D
  • Airport shuttle: Entire line, Terminal 4 - Parking P10.
Simvliet:
  • A: All, except for Stadionweg-Araplein section.
  • C: Simvliet Centraal Station - Airport - Centrum - Lelywaard - Delfsblaak
  • D: Hageningen, between Central Station and Strandboulevard
There is no 3rd rail between Simvliet West and Hageningen Centraal.
User avatar
Citadis
Posts: 302
Joined: 11 Jul 2017, 12:14
Location: Grenoble, France
Contact:

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by Citadis »

Sjoerd wrote: 09 Jun 2020, 10:13 With the parts I have, I am now planning these variations:
  • Santiago exterior, Driver operation interior (6,7,8 car combinations).
  • Paris exterior, Driver operation interior (5,6 car combinations).
  • Rijndam Airportshuttle, Driver operation interior (3 or 4 car combination; probably 3... or 4 if that fits the stopmarkers on the line).
More version you add, more I will be happy to use it. Perhaps you sould do (if possible/you want) both 3car and 4car version so 3car can be used in double-traction or multiple unit, and if 4car fits to Airport shuttle. 6car train is 90m lenght. 2 4car trains coupled is 120m (60+60) One carrige made approx. 15m.
Citadis : French Type of trams (yes, i'm french :) )
Sorry for my english but enjoy Metro Sim Beta !
Image
HexxOP
Posts: 89
Joined: 09 Jan 2019, 13:04

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by HexxOP »

HexxOP wrote: 09 Jun 2020, 12:48 Hehe, that's not the same model, MP05 design is based on MP89 (/NS-93) but is very different on a lot of technical aspects.
I correct myself, it seems that indeed, contrary to MP89, NS93 have a lot more on the roof.
NS93
NS93
Untitled-1.jpg (144.69 KiB) Viewed 2903 times
Little problematic when the train is "just" a reskin, but not exactly. :D
User avatar
Sjoerd
Posts: 5677
Joined: 26 Dec 2014, 21:14
Location: Alphen aan den Rijn

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by Sjoerd »

RotterdamMetroLover wrote: 10 Jun 2020, 10:50
Sjoerd wrote: 10 Jun 2020, 10:12 3rd rail options:
  • D: Hageningen, between Central Station and Strandboulevard
There is no 3rd rail between Simvliet West and Hageningen Centraal.
I never stated that. I just said there is 3rd rail in Hageningen, between the Central Station and Strandboulevard. ;)

Citadis wrote: 10 Jun 2020, 11:10 Perhaps you sould do (if possible/you want) both 3car and 4car version so 3car can be used in double-traction or multiple unit
Not possible; the couplers of the MP89 don't have elektrical components; they are only mechanical. Therefore, you can only couple to tow away another train, as you can't operate the doors of the train you are coupled to, and the engines of the coupled train also remain offline (meaning slower acceleration, as the coupled train is basically 'dead weight'). :D
CEO of the Rijndam Electrical Transport company :D
User avatar
Sjoerd
Posts: 5677
Joined: 26 Dec 2014, 21:14
Location: Alphen aan den Rijn

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by Sjoerd »

The Paris version (interior is still Santiago version, I'll look at that later). :)

Image
CEO of the Rijndam Electrical Transport company :D
User avatar
perfecttrains1000
Posts: 497
Joined: 30 Apr 2018, 17:50

Re: WIP Projects: CAF UT-440R and GEC-Alsthom NS-93

Post by perfecttrains1000 »

Sjoerd wrote: 10 Jun 2020, 18:56 The Paris version (interior is still Santiago version, I'll look at that later). :)
Niceeeee
- Likes London Underground
- Somehow relates anything to trains
Post Reply