Poll: Rijndam 2018 ex-freightyard connection

General discussions

Moderators: senjer, Tom

What would you like for the Bergenseweg railway connection?

Poll ended at 23 Apr 2017, 13:52

Leave it as it is; the rail connection is out of service, as the freight yard is no longer services by trains.
3
12%
Leave it as it is, but only as an optical closure (trains may pass through it; lets call it cheating).
4
16%
Open it up, and make it functional (in the CVL), for incidental use.
18
72%
 
Total votes: 25

User avatar
Sjoerd
Posts: 1608
Joined: 26 Dec 2014, 21:14
Location: Leiden

Re: Poll: Rijndam 2018 ex-freightyard connection

Post by Sjoerd » 21 Apr 2017, 11:04

Alfacinha315 wrote:Should I use the CVL to get there?
This connection is not in the current CVL.

(Looking at the current poll result, 74% in favor of opening it up, it will be usable trough the CVL in Rijndam 2018. Unless the poll result changes drastically before the poll closes.)
CEO of the Rijndam Electrical Transport company :D

User avatar
Sjoerd
Posts: 1608
Joined: 26 Dec 2014, 21:14
Location: Leiden

Re: Poll: Rijndam 2018 ex-freightyard connection

Post by Sjoerd » 23 Apr 2017, 14:10

The poll is closed and the results are in; 72% in favor of opening up the connection. :)

The modifications have been made; the connection is open in Rijndam 2018, and it has been build into the CVL. ;)
MattH wrote:Open in 1985 and 2018, closed in 2016 :)
Yes, I agree. In Rijndam 2016, I have fixed the problems that have been found since the release, but I will not make more changes there, so in that network it will remain closed.
Attachments
Rijndam 159 - Bergenseweg aansluiting.jpg
Rijndam 159 - Bergenseweg aansluiting.jpg (357.22 KiB) Viewed 53 times
CEO of the Rijndam Electrical Transport company :D

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest