Reminds me of the c2c.
Member of Parliment {House of Representatives/Tweede Kamer der Staten-Generaal} for Leidsebuurt and Haarlemmerplein
Still a curious geezer
Still a curious geezer
- EddyQ10Trains
- Posts: 87
- Joined: 02 Dec 2016, 18:13
- Location: Earth
Re: Rijndam
During peak hours, will the carriages on the M1 and the M6 increase from 2 cars (6 carriages) to 3 (9 carriages)?
Member of Parliment {House of Representatives/Tweede Kamer der Staten-Generaal} for Leidsebuurt and Haarlemmerplein
Still a curious geezer
Still a curious geezer
Re: Rijndam
No. I always try to avoid using coupling/uncoupling during planned exploitation, as that can easily cause delays (it takes some time to add extra units to a consist), and it can easily go wrong if there is already a delay.
Instead, I increase the frequency by adding more trains to the route. This is also a personal preference; I would prefer to see more trains an hour on my daily route, rather then longer but less frequent trains.
Instead, I increase the frequency by adding more trains to the route. This is also a personal preference; I would prefer to see more trains an hour on my daily route, rather then longer but less frequent trains.
CEO of the Rijndam Electrical Transport company
- EddyQ10Trains
- Posts: 87
- Joined: 02 Dec 2016, 18:13
- Location: Earth
Re: Rijndam
Oh, I see.Sjoerd wrote: ↑20 Jul 2017, 10:01 No. I always try to avoid using coupling/uncoupling during planned exploitation, as that can easily cause delays (it takes some time to add extra units to a consist), and it can easily go wrong if there is already a delay.
Instead, I increase the frequency by adding more trains to the route. This is also a personal preference; I would prefer to see more trains an hour on my daily route, rather then longer but less frequent trains.
Member of Parliment {House of Representatives/Tweede Kamer der Staten-Generaal} for Leidsebuurt and Haarlemmerplein
Still a curious geezer
Still a curious geezer
Re: Rijndam
You can always make your own activity with different use of rolling stock.
CEO of the Rijndam Electrical Transport company
- EddyQ10Trains
- Posts: 87
- Joined: 02 Dec 2016, 18:13
- Location: Earth
Re: Rijndam
Lol, I don't have the time to make my own activities, GCSE's.
Member of Parliment {House of Representatives/Tweede Kamer der Staten-Generaal} for Leidsebuurt and Haarlemmerplein
Still a curious geezer
Still a curious geezer
Re: Rijndam
Today I found a strange anomaly on line M6 (Rijndam 2020), at the same location as my last screenshot, but on the other track; all trains left the track, and got back to it 50 meters further.....
https://s26.postimg.cc/elxw9b45l/Semi-ontsporing.jpg
Service on line M6 was halted immediately , and the Rijndam Infra maintenance train was dispatched to investigate. The crew found the anomaly just as the M6 drivers reported it.
https://s26.postimg.cc/ijl5ypqyx/Semi-ontsporing2.jpg
As the cause for this problem could not be determined, it was decided to remove the defective track, and replace it. New track sections are being delivered;
https://s26.postimg.cc/h5tj3erpl/Semi-ontsporing3.jpg
And then, the 3rd rail;
https://s26.postimg.cc/g4taeaaq1/Semi-ontsporing4.jpg
Finally; a few tests, to see if the replacement has solved the problem, and to de-rust the new tracks (needed for reliable train detection and ATB functionality).
https://s26.postimg.cc/rv77vo3ih/Semi-ontsporing5.jpg
It takes some work to maintain a railway.....
https://s26.postimg.cc/elxw9b45l/Semi-ontsporing.jpg
Service on line M6 was halted immediately , and the Rijndam Infra maintenance train was dispatched to investigate. The crew found the anomaly just as the M6 drivers reported it.
https://s26.postimg.cc/ijl5ypqyx/Semi-ontsporing2.jpg
As the cause for this problem could not be determined, it was decided to remove the defective track, and replace it. New track sections are being delivered;
https://s26.postimg.cc/h5tj3erpl/Semi-ontsporing3.jpg
And then, the 3rd rail;
https://s26.postimg.cc/g4taeaaq1/Semi-ontsporing4.jpg
Finally; a few tests, to see if the replacement has solved the problem, and to de-rust the new tracks (needed for reliable train detection and ATB functionality).
https://s26.postimg.cc/rv77vo3ih/Semi-ontsporing5.jpg
It takes some work to maintain a railway.....
Last edited by Sjoerd on 02 May 2018, 18:21, edited 1 time in total.
CEO of the Rijndam Electrical Transport company
- EddyQ10Trains
- Posts: 87
- Joined: 02 Dec 2016, 18:13
- Location: Earth
Re: Rijndam
Wow!Sjoerd wrote: ↑21 Jul 2017, 21:15 Today I found a strange anomaly on line M6 (Rijndam 2020), at the same location as my last screenshot, but on the other track; all trains left the track, and got back to it 50 meters further.....
https://s26.postimg.org/elxw9b45l/Semi-ontsporing.jpg
Service on line M6 was halted immediately , and the Rijndam Infra maintenance train was dispatched to investigate. The crew found the anomaly just as the M6 drivers reported it.
https://s26.postimg.org/ijl5ypqyx/Semi-ontsporing2.jpg
As the cause for this problem could not be determined, it was decided to remove the defective track, and replace it. New track sections are being delivered;
https://s26.postimg.org/h5tj3erpl/Semi-ontsporing3.jpg
And then, the 3rd rail;
https://s26.postimg.org/g4taeaaq1/Semi-ontsporing4.jpg
Finally; a few tests, to see if the replacement has solved the problem, and to de-rust the new tracks (needed for reliable track detection and ATB functionality).
https://s26.postimg.org/rv77vo3ih/Semi-ontsporing5.jpg
It takes some work to maintain a railway.....
Member of Parliment {House of Representatives/Tweede Kamer der Staten-Generaal} for Leidsebuurt and Haarlemmerplein
Still a curious geezer
Still a curious geezer
Re: Rijndam
For those of you who have missed it earlier; at Station Rijndam Blaak, the other platform now has its own exit too;
Last edited by Sjoerd on 02 May 2018, 18:21, edited 1 time in total.
CEO of the Rijndam Electrical Transport company