Page 8 of 12

Re: Metrovagonmash 81-717

Posted: 30 Jan 2018, 20:28
by Jim2016
Michiel wrote: 30 Jan 2018, 19:29 I don't know, ask in the beta 3.13 topic. Oh wait, that's right, there isn't one! Sorry, you will have to wait for the official announcement.
Michiel wrote: 30 Jan 2018, 19:58 Impossible, things never go off-topic here :o
That irony… :lol:

Re: Metrovagonmash 81-717

Posted: 30 Jan 2018, 20:36
by LosAngelesMetro56
"Gotta lovem"
Ok, back to Россия.

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 11:43
by hell12
Alfacinha315 wrote: 30 Jan 2018, 19:24 What are the changes for Simvliet in beta 3.13?
You can look at the wiki

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 12:22
by Jim2016
hell12 wrote: 31 Jan 2018, 11:43 You can look at the wiki
There’s nothing in the wiki about the Beta 3.13 version of Simvliet, right now, as nothing has been announced yet.

Now, back to the topic. ;)

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 12:42
by MetroSimGermany
lol

I love how some people think a flamewar is being hold here...
Haven't you seen from the past times shortly before things were announced or a new beta came out that Michiel likes to be a troll sometimes? :lol:

Anyhow, I don't think anybody is fighting the other here, both Michiel and Sjoerd have done great work in my opinion.


Greets, Mika

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 14:37
by LosAngelesMetro56
I wonder when Sam will come out the closet and update us about his route.

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 16:02
by RotterdamMetroLover
Back to the topic.

Re: Metrovagonmash 81-717

Posted: 31 Jan 2018, 20:38
by Sjoerd
After all the testruns on all 3rd rail lines, there was still a bit of 3rd rail track these 'new' metro's haven't been yet...
In order to officially qualify these trains for passenger service (and not have service limitations other then "it needs 3rd rail"), they need to have done testruns to all corners of the network they might need to get to while in service. That includes the tracks to Nobelplein. Who knows; perhaps a shuttle Noorderpoort-Nobelplein is needed someday, due to maintenance works on line M1. Better be prepared. :D So, here we go;

Image
https://s26.postimg.cc/oucwnar1l/81-717_preview9.jpg

(Perhaps you have guessed already; as M4 is now fully ATB, the HSM is also usable there. However, for the HSM te keep functioning in both driving directions, you then can't pass any ZUB transponders along the way. So the ATB-ZUB changeover has moved away from Noorderpoort, also for M1, and is now located at Nobelplein; changeover from 3rd rail to overhead wire and ATB to ZUB at the same location. ;) Therefore, the 81-717 can get to Nobelplein under 3rd rail and ATB, but it can not go any further then the station itself.)

Re: Metrovagonmash 81-717

Posted: 05 Feb 2018, 22:34
by metrosimfan
Hello, will it give a mainatance scenario for the line M4? The contact wire will be dismantled. The M4 commutes only between Transferium and Noorderport.

Re: Metrovagonmash 81-717

Posted: 06 Feb 2018, 00:09
by Jim2016
metrosimfan wrote: 05 Feb 2018, 22:34 Hello, will it give a mainatance scenario for the line M4? The contact wire will be dismantled. The M4 commutes only between Transferium and Noorderport.
If Sjoerd hasn’t made such activity already (which I doubt he has), it’s too late now, since he has already sent the new Rijndam versions to Michiel, so that they’ll be added to the final release of Beta 3.13 (unless he makes the activity later).

Apart from that, remember that you can create this activity by yourself. ;)
Just take a look at other activity files and at this page → http://sim.bemined.nl/wiki/Basic_Activity_Guide