Beta 3.13

General discussions

Moderator: senjer

User avatar
LosAngelesMetro56
Posts: 941
Joined: 03 Oct 2015, 19:11
Location: Los Angeles, California, USA
Contact:

Beta 3.13

Post by LosAngelesMetro56 »

If there's going to be a Line C extension towards Delfsblaak, can it be powered by overhead wires, please?
This is now a dead account.
Enviro400Taco
Posts: 4
Joined: 11 Nov 2017, 12:14
Location: Leeds, England, UK

Re: Beta 3.13

Post by Enviro400Taco »

I wouldn't think it would make sense, as the rest of the C uses Third Rail.
Seem to prefer Dutch trains even though I'm British.
User avatar
Michiel
Site Admin
Posts: 2469
Joined: 11 Sep 2011, 13:32

Re: Beta 3.13

Post by Michiel »

Actually it's a good idea as it will stop people from asking for the 5300 series (which will be useless if all three lines have overhead wires) :twisted: :lol:
User avatar
Alfacinha315
Posts: 1032
Joined: 16 Sep 2016, 14:20

Re: Beta 3.13

Post by Alfacinha315 »

It would be a great idea, as well as a Simvliet Railway extension to Simvliet Airport (but here, the platform 2 would be enough).
Greetings from Lisbon, the capital city of Portugal.
User avatar
Alfacinha315
Posts: 1032
Joined: 16 Sep 2016, 14:20

Re: Beta 3.13

Post by Alfacinha315 »

BTW, are there plans to a future beta 3.13?
Greetings from Lisbon, the capital city of Portugal.
User avatar
Michiel
Site Admin
Posts: 2469
Joined: 11 Sep 2011, 13:32

Re: Beta 3.13

Post by Michiel »

Yes, and no I won't tell them since none of them are finalised (some could be pushed forward to 3.14 or even 3.15).
MattH
Posts: 152
Joined: 14 Mar 2017, 06:13

Re: Beta 3.13

Post by MattH »

Michiel wrote: 12 Nov 2017, 08:56 Actually it's a good idea as it will stop people from asking for the 5300 series (which will be useless if all three lines have overhead wires) :twisted: :lol:
But that doesn't stop people asking for the SG2/1 (5400 type) trains :ugeek: :twisted:
MattH
Posts: 152
Joined: 14 Mar 2017, 06:13

Re: Beta 3.13

Post by MattH »

Also, how is the progress on the MG2/1 & SG2/1 trains? (what needs to be done, etc.)
We've been waiting for nearly 5 years... (I want them for my Rijndam 2006/2018 activities)
User avatar
senjer
Posts: 1069
Joined: 13 Apr 2013, 11:31

Re: Beta 3.13

Post by senjer »

Still the same as before, and when everyone keeps asking for the 5300/5400 series the motivation to continue keeps dropping.
MattH
Posts: 152
Joined: 14 Mar 2017, 06:13

Re: Beta 3.13

Post by MattH »

“Such a work is never actually finished – one must simply declare it to be finished once one has done as much as possible given the time and circumstances.“ - Johann Wolfgang von Goethe (1749 – 1832)

Even if it is very very beta, the 5300/5400 series trains look basically complete.

Remember: the MG2s did not originally have a cab view when first released ;)
Locked