Beta 3.11

General discussions

Moderator: senjer

Post Reply
User avatar
Michiel
Site Admin
Posts: 2469
Joined: 11 Sep 2011, 13:32

Beta 3.11

Post by Michiel »

Expected release end of May 2017 8-)
Attachments
Beta311.jpg
Beta311.jpg (33.2 KiB) Viewed 10421 times
User avatar
metro sim addict
Posts: 48
Joined: 16 Sep 2016, 05:24

Re: Beta 3.11

Post by metro sim addict »

cool. Can't wait for Beta 3.11
Sub to my Youtube Channel Please!
youtube.com/GeorgeAllen
User avatar
Michiel
Site Admin
Posts: 2469
Joined: 11 Sep 2011, 13:32

Re: Beta 3.11

Post by Michiel »

Line C in Simvliet has been given a makeover in order to construct entrances to the stations and to undo the neighbourhood being split in two by the a metro line without crossings. Two stations have been elevated, while a third station has been lowered. In case of Driemansweg, the station has been lifted up a few meters to allow a passage below the tracks to the other platform:
Driemansweg.jpg
Driemansweg.jpg (196.58 KiB) Viewed 10390 times
At Noordplein, a new crossing has been added to allow passengers to access both platforms and to allow citizens to go to the other side of the track sa well:
Noordplein.jpg
Noordplein.jpg (152.51 KiB) Viewed 10390 times
User avatar
MetroSimGermany
Posts: 405
Joined: 08 Mar 2016, 14:41
Location: Berlin, Germany
Contact:

Re: Beta 3.11

Post by MetroSimGermany »

Great! 👍🏻

I always wondered how the people crossed the metro there aside from the small bridge at Parklaan and the street tunnel at Vismarkt...
Good that thats fixed. :)


Greets, Mika
Support auf Deutsch? Kein Problem! Ich helfe gerne per PM. ;)
Image
User avatar
VirtualGamer
Posts: 188
Joined: 29 Jan 2017, 01:56

Re: Beta 3.11

Post by VirtualGamer »

YEESSSSSSSSSSSS
Can't wait!
User avatar
MP 85
Posts: 546
Joined: 02 Jan 2017, 16:11
Location: France

Re: Beta 3.11

Post by MP 85 »

Michiel wrote: 27 Apr 2017, 16:23 Line C in Simvliet has been given a makeover in order to construct entrances to the stations and to undo the neighbourhood being split in two by the a metro line without crossings. Two stations have been elevated, while a third station has been lowered. In case of Driemansweg, the station has been lifted up a few meters to allow a passage below the tracks to the other platform:
Driemansweg.jpg

At Noordplein, a new crossing has been added to allow passengers to access both platforms and to allow citizens to go to the other side of the track sa well:
Noordplein.jpg
A refurbishment on Simvilet I look forward to seeing the result. Good work ;) 👍🏻
Image
MattH
Posts: 152
Joined: 14 Mar 2017, 06:13

Re: Beta 3.11

Post by MattH »

Looks good, Noordplein station looked like it was begging for the level crossing!
Are there any lift (elevator) objects for disabled access?
User avatar
LosAngelesMetro56
Posts: 941
Joined: 03 Oct 2015, 19:11
Location: Los Angeles, California, USA
Contact:

Re: Beta 3.11

Post by LosAngelesMetro56 »

Line C sounds interesting ;)
This is now a dead account.
User avatar
Alfacinha315
Posts: 1032
Joined: 16 Sep 2016, 14:20

Re: Beta 3.11

Post by Alfacinha315 »

At Stadionweg you could add that cross, in order to facility transfer.

Keep the good working Michiel! ;-) Can't wait for, the release...
Greetings from Lisbon, the capital city of Portugal.
User avatar
LosAngelesMetro56
Posts: 941
Joined: 03 Oct 2015, 19:11
Location: Los Angeles, California, USA
Contact:

Re: Beta 3.11

Post by LosAngelesMetro56 »

Stadionweg should have some kind of road overpass connecting the south and north communities in that area.

Edit: I wonder if elevators are objects...
This is now a dead account.
Post Reply